This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
observation:2025campaign [2025/01/27 12:20] – [Available instrumentation for 2025] etienne | observation:2025campaign [2025/03/11 13:08] (current) – bgelly | ||
---|---|---|---|
Line 8: | Line 8: | ||
The 2025 campaign shall observe the following schedule | The 2025 campaign shall observe the following schedule | ||
- | * December 2024: opening of call to apply for observation time during the 2025 campaign. See bellow for how to apply. | + | * < |
- | * <color orange> January 24th, 2025: proposal deadline for " | + | * <del> January 24th, 2025: proposal deadline for " |
- | * <color orange> February 17th, 2025: proposal deadline for " | + | * <del> February 17th, 2025: proposal deadline for " |
- | * March 2025: observation time allocation announced to applicants | + | * < |
+ | * 2025 campaign schedule v1.1 is [[call25: | ||
* April-July 2025: observation campaign | * April-July 2025: observation campaign | ||
* Fall 2025: integration of the spectroimaging [[technical: | * Fall 2025: integration of the spectroimaging [[technical: | ||
Line 31: | Line 32: | ||
=== How to apply === | === How to apply === | ||
+ | |||
+ | **The call for the 2025 observing campaign is now closed!** | ||
The submission of proposals is specific to the category of users one belongs, based on [[: | The submission of proposals is specific to the category of users one belongs, based on [[: | ||
* " | * " | ||
* Interested observers shall complete the **[[http:// | * Interested observers shall complete the **[[http:// | ||
- | * <color orange> Deadline: February 17th, 2025.</color> | + | * <del> Deadline: February 17th, 2025.</del> |
* " | * " | ||
* Applicants shall follow the instructions of the **[[http:// | * Applicants shall follow the instructions of the **[[http:// | ||
- | * <color orange> Deadline: January 24th, 2025. </color> | + | * <del> Deadline: January 24th, 2025. </del> |
* " | * " | ||
* Interested observers shall complete the **[[http:// | * Interested observers shall complete the **[[http:// | ||
- | * <color orange> Deadline: February 17th, 2025.</color> | + | * <del> |
As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the fall of 2025, the integration of [[technical: | As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the fall of 2025, the integration of [[technical: | ||
Line 76: | Line 79: | ||
* The data acquisition issue in polarimetric modes was tracked down to a bad synchronisation between the analyzer rotation and the camera exposure. This has been solved at the cost of slowing down the acquisition loop (roughly a factor 2 slower). This issue has been affecting all the September 2024 runs. | * The data acquisition issue in polarimetric modes was tracked down to a bad synchronisation between the analyzer rotation and the camera exposure. This has been solved at the cost of slowing down the acquisition loop (roughly a factor 2 slower). This issue has been affecting all the September 2024 runs. | ||
- | |||
- | |||