| Both sides previous revisionPrevious revisionNext revision | Previous revision |
| observation:2027campaign [2026/11/23 13:56] – etienne | observation:2027campaign [2026/11/23 15:35] (current) – [Available instrumentation for 2027] etienne |
|---|
| === How to apply === | === How to apply === |
| |
| The submission of proposals is specific to the instrument (MTR2 or IBIS 2.0) and the category of users one belongs, based on [[:observation#Observation rules of access| rules of access]]: | The submission of proposals is specific to the instrument (MTR2 or IBIS 2.0) and the category of users one belongs, based on [[:observation#Observation rules of access| rules of access]]. As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. Distinct proposals shall be made for the MTR2 and IBIS 2.0 instruments |
| * "French time": ~75% of the campaign, 52 days in 2026. | |
| * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call26/Forms/themis_proposal_2026_1.0.tex| LaTex application form]]** [[http://web.themis.iac.es/wdata/Call26/Forms/themis_proposal_2026_1.0.pdf | (PDF preview)]] and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**. | == MTR2 spectrograph == |
| * Deadline: Friday February 13th, 2026. | |
| * "Spanish time": 20% of the campaign, 14 days for 2026. | * "French time": ~75% of the MTR2 campaign, XXX days in 2027. |
| | * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call27/Forms/themis_proposal_2027_1.0.tex| LaTex application form]]** [[http://web.themis.iac.es/wdata/Call27/Forms/themis_proposal_2027_1.0.pdf | (PDF preview)]] and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**. |
| | * Deadline: Friday February 12th, 2027. |
| | * "Spanish time": ~20% of the MTR2 campaign, XXX days for 2027. |
| * Applicants shall follow the instructions of the **[[http://www.iac.es/OOCC/solar-cat| IAC solar CAT]]** proposal system. | * Applicants shall follow the instructions of the **[[http://www.iac.es/OOCC/solar-cat| IAC solar CAT]]** proposal system. |
| * Deadline: January 21st, 2026. | * Deadline: January XXst, 2027. |
| * "International time": ~5% of the total, or 3 days in 2026. \\ | * "International time": ~5% of the total, or XXX days for 2027. \\ |
| * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call26/Forms/themis_proposal_2026_1.0.tex| LaTex application form]]** [[http://web.themis.iac.es/wdata/Call26/Forms/themis_proposal_2026_1.0.pdf | (PDF preview)]] and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**. | * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call27/Forms/themis_proposal_2027_1.0.tex| LaTex application form]]** [[http://web.themis.iac.es/wdata/Call26/Forms/themis_proposal_2026_1.0.pdf | (PDF preview)]] and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**. |
| * Deadline: Friday February 13th, 2026. | * Deadline: Friday February 12th, 2027. |
| | |
| | == IBIS 2.0 == |
| | |
| | * "INAF time": ~75% of the IBIS 2.0 campaign, xxx days in 2027. |
| | * Interested observers shall xxxxx. |
| | * Deadline: xxxxx |
| | * "French time": ~20% of the IBIS 2.0 campaign, xxx days in 2027. |
| | * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call27/Forms/themis_proposal_2027_1.0.tex| LaTex application form]]** [[http://web.themis.iac.es/wdata/Call27/Forms/themis_proposal_2027_1.0.pdf | (PDF preview)]] and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**. |
| | * Deadline: Friday February 12th, 2027. |
| | * "Spanish time": ~5% of the IBIS 2.0 campaign, xxxx days for 2027. |
| | * Applicants shall follow the instructions of the **[[http://www.iac.es/OOCC/solar-cat| IAC solar CAT]]** proposal system. |
| | * Deadline: January xxxth, 2027. |
| | |
| |
| As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the spring of 2026, the integration of [[technical:ibis | IBIS 2.0]] being scheduled only a limited observation slots are possible. Users requiring observation time during this period shall provide specific justifications based on strong scientific arguments. | |
| |
| <newcolumn 40%> | <newcolumn 40%> |
| |
| <html><center> <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2026campaign:themisdome_sm.jpg"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2026campaign:themisdome_sm.jpg" style="width:50%; height: auto;"></a></center></html> | <html><center> <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=science:gallery:building:themis.jpg"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=science:gallery:building:themis.jpg" style="width:80%; height: auto;"></a></center></html> |
| |
| /* <html><center> | /* <html><center> |
| * A slowed-down (100Hz) version of the same system can be used to stabilize Mercury. | * A slowed-down (100Hz) version of the same system can be used to stabilize Mercury. |
| * While it is not possible to use TAO over the solar limb (or for neighbouring prominences), during the 2025 campaign, tests have been carried to observe prominences while TAO was focused on granulation in an offset disc region of THEMIS FOV. Even though the TAO isoplanatic region is located far from the targeted prominence, TAO nonetheless provided significant improvements, as shown in the [[science:imofmonth#August 2025|August THEMIS image of the month]]. | * While it is not possible to use TAO over the solar limb (or for neighbouring prominences), during the 2025 campaign, tests have been carried to observe prominences while TAO was focused on granulation in an offset disc region of THEMIS FOV. Even though the TAO isoplanatic region is located far from the targeted prominence, TAO nonetheless provided significant improvements, as shown in the [[science:imofmonth#August 2025|August THEMIS image of the month]]. |
| | |
| | === Exclusive use of the IBIS 2.0 and MTR2 instruments === |
| | In 2027, IBIS 2.0 & MTR2 instruments cannot be used simultaneously nor sequentially. Time allocation for each instrument will granted during distinct periods of the year. Separated proposals must be submitted by observers who which to use both instruments during the year. |
| | |
| |
| === MTR2 in spectroscopy mode === | === MTR2 in spectroscopy mode === |
| In this mode, up to 4 EMCCD Andor iXon cameras (512x512 pixels) and up to 2 (recent) Andor Zyla (2kx2k pixels) cameras are available. All 6 cameras can be setup and used at the same time (with their respective specifications), in accordance with the SP2 output physical limitations. | In this mode, up to 4 (new) Andor Zyla cameras up to 4 (old) EMCCD Andor iXon camera. Because of informatics and optical elements constraints, a maximum of 5 cameras can be setup and used simultaneously (with their respective specification), in accordance with the MTR2 spectrograph output physical limitations. |
| | * The Zyla cameras have 2048x2048 pixels: a typical setup shall give a spatial pixel of ~0.06” and a corresponding spectral pixel about ~3mÅ/pixel, which is much lower than the spectral resolution of MTR2 (hence we suggest to rebin, by a factor of 2 at least, in the lambda direction to increase S/N ratio). |
| | * The Ixon cameras have 512x512 pixels : a typical setup on these camera with a standard de-magnification will give a spectral resolution of ~0.0123 Å/pixel (12.3 mÅ/pixel) which is roughly the MTR2 spectral resolution. The spatial pixel will be about ~0.25”/pixel. |
| [[technical:mtr2 | More information about the MTR2 spectrograph.]] | [[technical:mtr2 | More information about the MTR2 spectrograph.]] |
| |
| === MTR2 in spectropolarimetry mode: === | === MTR2 in spectropolarimetry mode: === |
| THEMIS polarimetric analysis scheme is based on a full-Stokes analyzer located at the F1 prime focus. For any solar polarization state to measure, the output of the analyzer is made of dual superimposed complementary linear polarizations. Thanks to THEMIS "polarization friendly" new optical scheme, this output travels through the telescope and arrives unperturbed on the spectrograph cameras [[technical:mtr2 |(cf. information about MTR2 spectrograph)]]. Just in front of the camera, a Wollaston splitter separates the beam into complementary Stokes components to form the spectral focal plane. THEMIS own three Wollaston, hence 3 cameras/3 wavebands at most can be simultaneously observed with polarimetric signal, among the 6 spectral cameras that THEMIS proposes. It is however possible to combine polarimetric and non-polarimetric cameras. | THEMIS polarimetric analysis scheme is based on a full-Stokes analyzer located at the F1 prime focus. For any solar polarization state to measure, the output of the analyzer is made of dual superimposed complementary linear polarizations. Thanks to THEMIS "polarization friendly" new optical scheme, this output travels through the telescope and arrives unperturbed on the spectrograph cameras [[technical:mtr2 |(cf. information about MTR2 spectrograph)]]. Just in front of the camera, a Wollaston splitter separates the beam into complementary Stokes components to form the spectral focal plane. THEMIS own three Wollaston, hence 3 cameras/3 wavebands at most can be simultaneously observed with polarimetric signal, among the 6 spectral cameras that THEMIS proposes. It is however possible to combine polarimetric and non-polarimetric cameras. |
| | |
| Regarding the available analysis software: | |
| | |
| === Broadband imaging (BBI) context camera: === | === Broadband imaging (BBI) context camera: === |
| === Available analysis softwares === | === Available analysis softwares === |
| |
| * Knox-Thompson image reconstruction for BBI | * Broadband imaging (BBI): Knox-Thompson (speckle) image reconstruction on-site tools. |
| * Reconstructed spectral map quick-looks for on site analysis, to be adapted to specific wavelength. | * MTR2: a python MTR2 data reduction and data inspection software package, either with or without polarimetry: [[https://github.com/SaidaKIS/Themis.git]] |
| * Stokes map quick-looks | * MTR2 reconstructed spectral map quick-looks for on-site analysis, to be adapted to specific wavelength. |
| * Thanks to V. Bommier, a basic magnetic field inversion software package (running locally in IDL) is also available. | * MTR2 Stokes map quick-looks for on-site analysis. |
| | * If observing the Fe I @ 6302 \AA spectral range with MTR2, thanks to V. Bommier, a basic magnetic field inversion software package (Matlab & Fortran), based on the Unnofit code, is also available, as well as quicklook magnetograms. |
| | * IBIS 2.0: xxxxx |
| |
| |