-THEMIS 2026 observing campaign will take place approximately from early September to mid-september, 2026, lasting for about 70 days. The 1st half of 2026 shall be mostly dedicated to the on-going installation and commissioning of the [[technical:ibis | Italian IBIS 2.0 spectro-imager]].+THEMIS 2026 observing campaign will take place approximately from early September to mid-November, 2026, lasting for about 70 days. The 1st half of 2026 shall be mostly dedicated to the on-going installation and commissioning of the [[technical:ibis | Italian IBIS 2.0 spectro-imager]].
  
 ==== 2026 campaign schedule ==== ==== 2026 campaign schedule ====
Line 9: Line 9:
 The 2026 campaign shall observe the following schedule: The 2026 campaign shall observe the following schedule:
   * December 2025: opening of call to apply for observation time during the 2025 campaign. See bellow for how to apply.   * December 2025: opening of call to apply for observation time during the 2025 campaign. See bellow for how to apply.
-  * January XXth, 2026: proposal deadline for "Spanish time" observers  +  * ** January XXth, 2026: proposal deadline for "Spanish time" observers ** 
-  * February 12th, 2026: proposal deadline for "French time" & "International time" observers +  * ** February 12th, 2026: proposal deadline for "French time" & "International time" observers **
   * March 2026: observation time allocation announced to applicants   * March 2026: observation time allocation announced to applicants
-  * Spring 2026: commissioning of the spectro-imaging [[technical:ibis | IBIS 2.0 instrument]] +  * Spring 2026: commissioning of the [[technical:ibis | IBIS 2.0 spectro-imager]] 
-  * ** September-mid-November 2026: observation campaign**+  * ** September to mid-November 2026: observation campaign ** 
 /*  * [[observation:2025campaign:schedule | 2025 campaign schedule]] v1.3 (status **confirmed** cf. images on the right)  /*  * [[observation:2025campaign:schedule | 2025 campaign schedule]] v1.3 (status **confirmed** cf. images on the right) 
 [[call25:2025_observing_schedule|here]]*/ [[call25:2025_observing_schedule|here]]*/
Line 19: Line 19:
 ==== Call for observation time during the 2026 campaign  (open) ==== ==== Call for observation time during the 2026 campaign  (open) ====
  
-**The call for the 2025 observing campaign is now open!**+<color red > ** The call for the 2025 observing campaign is now open! ** </color>
  
 Interested researchers are encouraged to check the **[[#Available instrumentation for 2026 | available instrumentation for 2026]]**, the **[[technical:description| information on THEMIS observing capacities]]**, as well as the **[[observation:data|available data products]]**.\\ Interested researchers are encouraged to check the **[[#Available instrumentation for 2026 | available instrumentation for 2026]]**, the **[[technical:description| information on THEMIS observing capacities]]**, as well as the **[[observation:data|available data products]]**.\\
Line 28: Line 28:
  
 The submission of proposals is specific to the category of users one belongs, based on [[:observation#Observation rules of access| rules of access]]:      The submission of proposals is specific to the category of users one belongs, based on [[:observation#Observation rules of access| rules of access]]:     
-   * "French time": 75% of the campaign, 75 days in 2025.  +   * "French time": 75% of the campaign, 52 days in 2026.  
-     * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call25/Forms/themis_proposal_2025_1.0.tex| LaTex application form]]**  and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**.  +     * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call25/Forms/themis_proposal_2026_1.0.tex| LaTex application form]]**  and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**.  
-     <del> Deadline: February 17th2025.</del> +     * Deadline: February 12th2026
-   * "Spanish time": 20% of the campaign, 20 days for 2025+   * "Spanish time": 20% of the campaign, 14 days for 2026
      * Applicants shall follow the instructions of the **[[http://www.iac.es/OOCC/solar-cat| IAC solar CAT]]** proposal system.       * Applicants shall follow the instructions of the **[[http://www.iac.es/OOCC/solar-cat| IAC solar CAT]]** proposal system. 
-     <del> Deadline: January 24th2025</del> +     * Deadline: January XXth2026
-   * "International time": 5% of the total, or days in 2025. \\ +   * "International time": 5% of the total, or days in 2026. \\ 
-     * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call25/Forms/themis_proposal_2025_1.0.tex| LaTex application form]]**  and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**.  +     * Interested observers shall complete the **[[http://web.themis.iac.es/wdata/Call25/Forms/themis_proposal_2026_1.0.tex| LaTex application form]]**  and e-mail it to: **[[themis.team@themis.iac.es|themis.team@themis.iac.es]]**.  
-     <del>Deadline: February 17th2025.</del>+     * Deadline: February 12th2026.
  
- As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the fall of 2025, the integration of [[technical:ibis | IBIS 2.0]] being scheduled only a limited observation slots are possible. Users requiring observation time during this period shall provide specific justifications based on scientific reasons.+ As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the spring of 2026, the integration of [[technical:ibis | IBIS 2.0]] being scheduled only a limited observation slots are possible. Users requiring observation time during this period shall provide specific justifications based on strong scientific arguments.
  
 <newcolumn 40%> <newcolumn 40%>
  
-<html><center> <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=results:gallery:building:themis_teide.jpg"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=results:gallery:building:themis_teide.jpg" style="width:50%; height: auto;"></a></center></html> +<html><center> <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=science:gallery:building:themisdome.jpg"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=science:gallery:building:themisdome.jpg" style="width:50%; height: auto;"></a></center></html> 
  
-<html><center>+/* <html><center>
 2025 Campaign schedule: 2025 Campaign schedule:
 <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:sched_2025.png"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:sched_2025.png" style="width:99%; height: auto;"></a> <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:sched_2025.png"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:sched_2025.png" style="width:99%; height: auto;"></a>
 <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:tsched_2025.png"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:tsched_2025.png" style="width:95%; height: auto;"></a> <a href="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:tsched_2025.png"><img src="https://www.themis.iac.es/lib/exe/fetch.php?media=observation:2025campaign:tsched_2025.png" style="width:95%; height: auto;"></a>
-</center></html>+</center></html> */
  
 </columns> </columns>
Line 58: Line 58:
 [[technical:tao|TAO]] is available and tested over sunspots and granulation with good results over significantly long periods of time (seeing dependent). [[technical:tao|TAO]] is available and tested over sunspots and granulation with good results over significantly long periods of time (seeing dependent).
     * A slowed-down (100Hz) version of the same system can be used to stabilize Mercury.     * A slowed-down (100Hz) version of the same system can be used to stabilize Mercury.
-    * At the moment it is not possible to use the AO over the solar limb (or for neighboring prominences).+    * While it is not possible to use TAO over the solar limb (or for neighboring prominences), during the 2025 campaign, tests have been carried to observe prominences while TAO was focused on granulation in an offset disc region of THEMIS FOV. Even though the TAO isoplanatic region is located far from the targeted prominence, TAO nonetheless provided significant improvements, as shown in the [[science:imofmonth#August 2025|August THEMIS image of the month]].
  
 === MTR2 in spectroscopy mode === === MTR2 in spectroscopy mode ===
-  
 In this mode, up to 4 (old) EMCCD Andor iXon camera (512x512) and up to 2 (new) Andor Zyla (2kx2k) cameras are available. Both 6 cameras can be setup and used at the same time (with their respective specs),  in accordance with the SP2 output physical limitations.   In this mode, up to 4 (old) EMCCD Andor iXon camera (512x512) and up to 2 (new) Andor Zyla (2kx2k) cameras are available. Both 6 cameras can be setup and used at the same time (with their respective specs),  in accordance with the SP2 output physical limitations.  
-[[technical:mtr2 | More information about the MTR2 spectrograph.]] +[[technical:mtr2 | More information about the MTR2 spectrograph.]]      
  
 === MTR2 in spectropolarimetry mode: ===    === MTR2 in spectropolarimetry mode: ===   
-In this mode, 3 cameras (hence 3 wavelengths) at most are available, from the above list. It is possible to combine polarimetric and non-polarimetric cameras. THEMIS polarimetric analysis scheme is based on a full-Stokes analyzer located at the F1 prime focus. For any solar polarization state to measure, the output of the analyzer is made of dual superimposed complementary linear polarizations. Thanks to THEMIS "polarization friendly" new optical scheme, this output travels through the telescope and arrives unperturbed on the spectrograph cameras. Just in front of the camera, a Wollaston splitter separates the beam into complementary Stokes components to form the spectral focal plane.  +THEMIS polarimetric analysis scheme is based on a full-Stokes analyzer located at the F1 prime focus. For any solar polarization state to measure, the output of the analyzer is made of dual superimposed complementary linear polarizations. Thanks to THEMIS "polarization friendly" new optical scheme, this output travels through the telescope and arrives unperturbed on the spectrograph cameras [[technical:mtr2 |(cf. information about MTR2 spectrograph)]]. Just in front of the camera, a Wollaston splitter separates the beam into complementary Stokes components to form the spectral focal plane. THEMIS own three Wollaston, hence 3 cameras/3 wavebands at most can be simultaneously observed with polarimetric signal, among the 6 spectral cameras that THEMIS proposes. It is however possible to combine polarimetric and non-polarimetric cameras
-[[technical:mtr2 | More information about the MTR2 spectrograph.]] +
  
 Regarding the available analysis software:       Regarding the available analysis software:      
-      * A Stokes map quick-look is now available. +      
-      * Thanks to V. Bommier, a basic magnetic field inversion software package (running locally in IDL) is available. +
 === Broadband imaging context camera: ===  === Broadband imaging context camera: === 
-It is running concurrently with the spectrograph. Current setup is for 656 nm (red), but this can be changed optionally to G-band or other. +THEMIS BBI fast camera (40 frames/s) is running concurrently with the spectrograph. Current setup is for 656 nm (red), but can be changed optionally to G-band or other.  
 + 
 +=== Available analysis softwares === 
 + 
 +   * Knox Thompson image reconstruction for BBI 
 +   * Reconstructed spectral map quick-looks for on site analysis, to be adapted to specific wavelength. 
 +   * Stokes map quick-looks 
 +   * Thanks to V. Bommier, a basic magnetic field inversion software package (running locally in IDL) is also available. 
  
-== 2024 known problems (and solutions) ==+/* == 2024 known problems (and solutions) ==
  
   * The optical diffusion problem that was detected in Sept 2024 (mostly affecting the He D3 observations) has been identified and corrected (November 2024).   * The optical diffusion problem that was detected in Sept 2024 (mostly affecting the He D3 observations) has been identified and corrected (November 2024).
-  * The data acquisition issue in polarimetric modes was tracked down to a bad synchronisation between the analyzer rotation and the camera exposure. This has been solved at the cost of slowing down the acquisition loop (roughly a factor 2 slower). This issue has been affecting all the September 2024 runs.+  * The data acquisition issue in polarimetric modes was tracked down to a bad synchronisation between the analyzer rotation and the camera exposure. This has been solved at the cost of slowing down the acquisition loop (roughly a factor 2 slower). This issue has been affecting all the September 2024 runs. */
  